Three-Phase Power Installation · Mildura, VIC

Three-Phase Power Installation Mildura.

Three-phase supply for packing sheds, irrigation pumps, large EV chargers, workshops and high-load homes. Properly designed, switchboard-upgraded and compliant. Servicing Mildura and surrounds on our regular daily run from Mildura HQ.

REC 31859 Licensed & insured
Same day Business-hours response
Local From Mildura HQ
REC 31859 Licensed ABN 46 646 056 804 Mildura locally owned · Since 2020 Trusted by Mildura Base Hospital, SuniTAFE, RAYGEN
Three-Phase Power Installation Mildura

What we do

  • Single-to-three-phase upgrades
  • Three-phase switchboard design and build
  • Motor and pump connections
  • Three-phase EV chargers (11–22 kW)
  • Liaison with grid distributor (Powercor / Essential Energy)

Why locals choose NextES

  • Industrial-grade design discipline applied even on residential jobs
  • Liaison with the network provider handled for you
  • Compliant switchboard build
  • Local team — no four-week wait for a remote contractor

Working in Mildura

We are in and around Mildura regularly — areas including Mildura CBD, Deakin Avenue, Mildura Base Hospital, Mildura Airport, Mildura South industrial precinct, Aquacoustic estates. Whether you are off a main strip or out on a rural block, we cover the postcode.

← All services in Mildura   ·   Three-Phase Power Installation across the Sunraysia →

Request a quote

By sending you agree to our privacy policy. Or call us direct on 0413 635 112.

Three-Phase Power Installation Mildura — FAQs

Do you charge a call-out fee to Mildura for three-phase power installation?

Mildura is on our regular run. Standard service call applies — no extra travel surcharge.

Are you licensed for three-phase power installation work in VIC?

Yes. REC 31859, fully insured, ABN 46 646 056 804. We hold the licensing required to work both sides of the river.

Do I need three-phase for my new EV charger?

Only if you want faster than 7 kW charging or you have multiple EVs. For most households single-phase 7 kW is plenty.

How long does a three-phase upgrade take?

Depends on the network provider's response time more than ours. Plan on 4–8 weeks end to end. We coordinate the network application.

Three-Phase Power Installation in Mildura? Sorted.

Plain-English quote, REC 31859, on-time turn-up.

Call 0413 635 112 Get a quote