Three-Phase Power Installation. Mildura & Sunraysia
Three-phase supply for packing sheds, irrigation pumps, large EV chargers, workshops and high-load homes. Properly designed, switchboard-upgraded and compliant.
What we do
- Single-to-three-phase upgrades
- Three-phase switchboard design and build
- Motor and pump connections
- Three-phase EV chargers (11–22 kW)
- Liaison with grid distributor (Powercor / Essential Energy)
Why NextES for this
- Industrial-grade design discipline applied even on residential jobs
- Liaison with the network provider handled for you
- Compliant switchboard build
- Local team — no four-week wait for a remote contractor
Sectors we serve with this
Four steps from call to job done
Enquiry
Call or send the form. We respond same business day.
Site visit / scope
For anything bigger than a basic call-out, we look at the job and scope it properly.
Written quote
Through SimPRO. Plain English. No surprise add-ons.
Done & guaranteed
Job complete, certificate issued where required, workmanship backed.
Three-Phase Power Installation across Mildura, Sunraysia & Southern NSW
We provide three-phase power installation across the region. Click your town for a local quote.
Frequently asked questions
Do I need three-phase for my new EV charger?
Only if you want faster than 7 kW charging or you have multiple EVs. For most households single-phase 7 kW is plenty.
How long does a three-phase upgrade take?
Depends on the network provider's response time more than ours. Plan on 4–8 weeks end to end. We coordinate the network application.